top of page
Mobility
Each Completed Field Hospital Type A can be transported on Regular 40 feet Container Trucks and can be Simply Installed on the Ground in Developed or Remote Areas with Limited Ground Preparation.
-
Site Installation is Quick – a Maximum of Two Days for Twenty Men from Arrival on Site.
-
A Diesel Power Generator can be provided if Electrical Mains Power is not available.
-
A Simple Water Supply and Waste Water Containment Tank is required locally to support the Ablution Container.
Mobilization
Field Hospital Type A is being manufactured in Dubai Industrial City. Each Field Hospital Type A takes 6 Days to Manufacture

bottom of page